Home > News > Content
Construction Site Preparation
Nov 04, 2017

In large construction work, it is necessary to set up professional PVC formwork production barrack, site had better leave special PVC formwork (especially the large shape plate) for assignments section. PVC formwork laid, construction preparation before the PVC formwork approach by engineering, safety director for inspection according to the requirement of the construction organization design about the PVC formwork acceptance and unqualified products shall not be assigned to the team. Experienced and qualified PVC formwork should be in strict accordance with the unit, serial number, model, specification and requirements allocated to each molding team, and head signed by both parties.


blob.png

Product Catalog

We're Here to Help

  • +86 371 67882583
    +86 371 67882583
    selina@zzlanke.com.cn
    Room 1704,No.28 business outer ring       road,CBD,ZhengZhou,HeNan,China

Newsletter

Enter in your email address to receive deals
and coupons.
Bookmark us today!